β If you apply anything different from these rates, you MUST log a change order before continuing.
No exceptions. This protects us from the Cabin Creek situation: verbal directive, no paper trail, we eat the cost.
β
β
β
β Your input rate differs from the contract. Click below to capture the change order. Calculate is locked until you do.
β Change order logged Β· Rena + Brydon texted Β· You can now Calculate.
π Specifications
Enter specs exactly as shown on the job specification sheet.
Job Name
Truck
Loads Completed0 / 8 expected today
Log Load #1
Lift 1 Β· Loading info below
π§ͺ What Goes In This Load
β Mark Load Complete
πΏ Hose Work This Load?
β±οΈ Water / Reload Wait This Load?
β οΈ Waits over 10 min will be flagged as potentially billable on the load sheet.
π Notes for This Load (optional)
π Completed Loads
No loads logged yet β tap complete after each load.