Job Information
Project details, bidding agency, and key dates
Job Type
Determines wage rates, minimum bid floors, and certified payroll requirements
Commercial
Standard wage rates · No certified payroll
Government / WSDOT
Prevailing wages · Certified payroll · $1,200 min bid
Standard Rates
Planter (base)$40.00/hr
Planter (burdened)$44.86/hr
Equipment Op (base)$60.00/hr
Equipment Op (burdened)$67.10/hr
CDL Driver (burdened)$45.31/hr
Prevailing Wage Rates
Planter (prevailing)— Set from L&I
Equipment Op (prevailing)— Set from L&I
CDL Driver (prevailing)— Set from L&I
Certified payroll adder+5% markup
Min bid floor$1,200
⚠️ Government Minimum Bid Floor Active — Jobs under 6,000 SF and within 1 hour of Woodland, WA will be bid at a minimum of $1,200 regardless of calculated total.
Screenshot should also be saved to the Proof tab in your bid spreadsheet.
Scope of Work
Select all scopes present in this bid. Each triggers its own takeoff and rate logic.
✓
Hydroseeding
Priced per SF · Seed mix A–E
✓
Plant Installation
Labor + material · By container size
✓
Bark / Mulch Blowing
Priced per CY · By product type
✓
Irrigation
Per zone · Commercial or residential
✓
Soils / Amendments
Compost, sand, topsoil · Per CY
✓
Rock / Aggregate
River rock, crush, pea gravel · Per CY
✓
Site Prep / Grading
Skidsteer, power rake · Per hour
✓
Maintenance / PSIPE
WSDOT plant establishment · Per month
✓
Mobilization
Travel + setup · Per mobilization
Site Conditions
These flags drive the markup calculator. Check all that apply.
Under 1.5 hrs required for hydroseed jobs under 5,000 SF
Triggers go/no-go check and markup adder for small jobs
✓
🚛 Cannon Application Eligible
Site access allows truck — no hose required
✓
🚿 Hose Work Required
Adds markup — $105/15 min (gov) or % adder (comm)
✓
💧 Water Fillup Within 4 Miles
No high traffic · Efficient refill cycle
✓
⛰️ Slope Steeper Than 4H:1V
Higher mulch rate · More time · Adds markup
✓
🚦 High Traffic Route to Water
Affects cannon eligibility for comm jobs
✓
🔄 Multi-Load Job (18,001+ SF)
Multiple truck loads required
Markup Calculator
Calculated from site conditions above. Override requires approver sign-off.
Base Markup
+25%
Small Job (<5,000 SF)
+0%
Drive Time Over 1 Hour
+0%
Hose Work Required
+0%
Slope Steeper Than 4H:1V
+0%
Government / Certified Payroll
+0%
Multi-Load Efficiency Discount
+0%
Calculated Markup
25%
%
Approver must sign off below when overriding calculated markup.
Markup Approved By
Kevin Wilber
Bids
Rena
Owner / Scheduler
Brydon
Co-Owner / Field