| Site & Address | Sq Ft |
Lawn | Shrb | Tree | Irr |
Bio | GC |
Monthly | Hrs | Labor | Fuel | Profit |
Type Hrs/visit per site and the settings bar figures the rest. Labor/mo = hrs × 4.33 weekly visits × the loaded crew rate. Fuel/mo is each stop's own drive miles on the route ÷ MPG × $/gal × 4.33. Profit/mo = Monthly β Labor β Fuel. Sq ft, monthly rate and the checkboxes save instantly. Print/Save-PDF with Ctrl/Cmd‑P.