๐Ÿ›ฃ๏ธ 179th & I-5 โ€” Materials
WSDOT Topsoil A stockpile ยท staging yard
← Yard
๐Ÿงช Why these goals โ€” the 179th mix
Final product = 1,240 CY ยท 60% sandy loam (744 CY) + 40% fine compost (496 CY).
Sandy loam blends 3 topsoil : 1.5 sand โ†’ that 744 CY needs 496 CY topsoil + 248 CY sand.
So the yard stages → 496 CY topsoil ยท 248 CY sand ยท 496 CY compost.
๐Ÿงฎ Mix CalculatorEnter compost CY โ†’ get the sand & topsoil to blend a batch

Materials โ€” goal vs. on hand

Loadingโ€ฆ
Log it the second it’s dumped and snap the load ticket. The office reviews and verifies โœ… each one.

Incoming loads

Loadingโ€ฆ
Bella Terra LLC โ€” every truckload logged with who + when; the office ties each to its load ticket so the built stockpile is fully documented for WSDOT.